|
Product Details:
|
| Hardness: | HRC58 | Accuracy: | +/-0.003mm |
|---|---|---|---|
| Surface Treatment: | Polished, Tin, Ticn, Crn, Dlc | Product Name: | Mold Core Insert |
| Quality: | High Quality | Shaping Mode: | Plastic Die Mould |
| Product Material: | Skh | Product: | Plastic Injection Mold |
| Standard: | JIS, DIN, En, ASTM, AISI | Design Software: | Autocad, Autocad/Ug/Solidworks, CAD |
| Size: | Customize | Color: | Customize |
| Feature: | Durable | Usage: | Bottle Caps Mold Insert |
| Delivery Time: | 5-20 Days | ||
| Highlight: | OEM Die Steel Core Insert,High Concentricity Mold Core Inserts,Mold Inserts for Injection Molding Tool |
||
Core Insert molding is a specialized process where heat-softened plastic material is forced from a cylinder into a cavity that gives the article its desired shape. This method is used with both thermoplastic and thermosetting materials.
Core Insert molding is one of several processes used to mold plastic around non-plastic items. The key distinction from overmolding is that Core Insert Molding involves molding plastic around a non-plastic component, while overmolding typically involves molding rubber-like plastic over another plastic component for features like ergonomic grips, bump stops, or aesthetic enhancements.
| Item | Precision mold core and cavity |
|---|---|
| Process | Milling - CNC - Heat treatment - Grinding - CNC - Walking silk - EDM - Polishing |
| Material | SKD61, S136, Stavax, 1.2344, 1.2379, 1.2312, etc. |
| Tolerance | +/-0.003mm as per requirement |
| Facility | CNC Machining Center, Japan Sodick CNC, Sodick EDM EDGE3, etc. |
| Certificates | Material certificate, CMM inspection report, dimension report, final QC reports |
| Processing Time | 15 days |
| Shipping | 3-10 days by DHL/UPS/FedEx express, air freight, etc. |
| Delivery & Service | Timely delivery with safe carton box packaging. Our target is to satisfy every customer with the best products and services. |
We provide comprehensive one-stop plastic injection molding services including:
Delivery: Standard delivery time is 6 days for ejector pins and sleeves, with specific timing based on quantity and drawing requirements.
Shipping: We ship using express carriers such as DHL, UPS, FedEx, etc., or according to customer requirements. Express shipping typically takes about 3 days to arrive, with proof of shipment and tracking numbers provided. For larger quantities, we offer economical ocean shipping options.
Contact Person: Miss. Merry
Tel: +8618666474704
Fax: 86-769-81875281