|
Product Details:
|
| Hardness: | HRC60 | Accuracy: | +/-0.005mm |
|---|---|---|---|
| Surface Treatment: | Polished, Tin, Ticn, Crn, Dlc | Product Name: | Thread Core |
| Quality: | High Quality | Shaping Mode: | Plastic Die Mould |
| Product Material: | Customize | Product: | Plastic Injection Mold |
| Standard: | JIS, DIN, En, ASTM, AISI | Design Software: | Autocad, Autocad/Ug/Solidworks, CAD |
| Size: | Customize | Color: | Black |
| Feature: | Durable | Usage: | Injection Plastic Mold Parts |
| Delivery Time: | 5-20 Days | ||
| Highlight: | High Parallelism Core Insert Mold Parts,Nitriding Core Insert Mold Parts,Cosmetics Cap Injection Tooling Core Insert |
||
Core Insert molding shares similarities with overmolding, incorporating different materials into the same part to enhance properties. While both processes slightly increase molded part costs, this is typically offset by eliminating manual post-molding operations. Lead time for overmolded and insert molded parts is 15 days—longer than single-part injection molding but significantly faster than traditional Core insert molding.
Unlike overmolding's two-step process requiring separate shots for substrate and overmold, Core insert molding is completed in a single operation. Threaded inserts, bushings, sleeves, or bosses are manually placed into the mold before plastic injection, resulting in improved part strength and reliability.
Additional benefits include product weight reduction when plastic parts with metal inserts replace all-metal components, and frequently lower overall costs compared to parts requiring assembly operations.
| Place of Origin | Dongguan, China |
| Product Name | Core Insert |
| Product Material | 1.2344, 1.2312, 1.2379, Stavax, HSS, SKD61, SKH51, S136 etc |
| Hardness | HRC 44-62 |
| Machining Process | W-EDM, Grinding, QC |
| Tolerance | +/-0.005mm |
| Certification | ISO9000 |
| MOQ | 1Pcs |
| OEM/ODM/Customized | Available |
Pricing: Varies according to order quantity
| Step | Business Process | Content | Time |
|---|---|---|---|
| 1 | Receive inquiries | Confirm customer needs | 1 Day |
| 2 | Process an order | Confirm customer order details | - |
| 3 | Put into production | Order raw materials / Arrange process department | 1-3 Days |
| 4 | Quality inspection and control | Three-coordinate machine and manual testing with test report | 10-30 Days |
| 5 | Product packaging | Shipping department packaging per customer requirements | 1-3 Days |
| 6 | Product outbound | Shenzhen Port | 1-3 Days |
| 7 | Product acceptance | - | - |
A: We typically quote within 24 hours after receiving your inquiry. For urgent requests, please call us or indicate in your email for priority handling.
A: Lead time depends on mold size and complexity, normally 25-35 days. Simple, smaller molds can be completed within 15 days.
A: Provide us with a sample, and we'll help complete the 3D drawing design.
A: We specialize in high-quality products with QC inspection before each shipment. You can visit our factory, request third-party inspection, or we can send production process videos.
A: We accept Paypal, Western Union, T/T, and L/C—choose whichever is convenient for you.
A: Yes, we offer reasonable discounts for large orders, returning customers, and frequent clients.
A: By sea to your nearest port, by air to your nearest airport, or by express (DHL, UPS, FEDEX, TNT, EMS) to your door.
Contact Person: Miss. Merry
Tel: +8618666474704
Fax: 86-769-81875281